Soltech’s subsidiary in facade project for Peab with an order value of just over SEK 8 million
Soltech Energy's subsidiary, Fasadsystem, has a new agreement to install a large facade project for the construction company Peab. Lundbyskolan at Hisingen in Gothenburg will get a a new facade with an order value of just over SEK 8 million. The new façade will largely consist of recycled aluminum, which reduces the façade's climate footprint.
Fasadsystem have a long experience of assembling and building large facade solutions. The company has received a new order from the construction company Peab to build the facade at Lundbyskolan in Gothenburg.
The aim is to create a climate-efficient façade that is produced with minimal carbon dioxide emissions. To achieve this, Hydro Circal is used, a material of high-quality and almost only recycled aluminum. The construction will start at the beginning of 2022.
– For us at Fasadsystem this project is a proof of our clear ambition to build for the future in a double sense. It feels just right when we use recycled material when we create environments for our future generations – the schoolchildren and youngsters. It is our duty to do everything we can to contribute to a sustainable future, something that this façade will be a good example of, says Oliver Tavander, Project manager at Fasadsystem.